It is possible to generate a WM+ from:
- confirmed WM-
- IO for which a WM- has already been generated
- receiving and delivery report when a WM+ has not yet been generated for a WM- document, the system generates a confirmed WM+ at the moment of confirming RDR
From one WM- document it is possible to generate only one WM+ document for entire quantity of the items from the WM- documents. It is not possible to generate a WM+ for a part of items from a WM-. Moreover, if on a WM- there are packs specified, the structure of packs from the source WM- document will be maintained on the WM+. Packs created this way cannot be deleted, nor their content can be changed.
Detailed description of the document form and its tabs can be found in subcategory Document forms.
On a generated WM+ document it is possible to modify:
- date of issue
- delivery method
- center
- description
- UPC code and description of packs